Made in China Stationary Concrete Pump/Concrete Trailer Pump Sales
Production description:
Product name |
Concrete pump |
Max Theoretical Concrete Output
(m³/h)(Low/High pressure) (MPa) |
75/46 |
Engine or Motor |
Diesel fuel engine |
Main oil pump |
KAWASAKI |
Engine power |
130kw |
Concrete slump |
100-230 |
Max. Theoretical Horizontal/Vertical Distance |
1200/200 |
Aggregate size |
≤30 |
Speed |
2300r/min |
Concrete cylinder diameter |
200mm*1600mm |
Hopper capacity |
0.80m3 |
Hydraulic power |
33MPa |
Dimension |
6200mm*1600*2200mm |
Total Weight |
6200kg |
About us:
1: We are factory with 20 years manufacture experience;
2: With ability to customize as your requirements;
3: Short lead time and has items in stock;
"It is our goal to ensure that the work we do at Machine and Equipment development is superior and that satisfy of clients is a priority on all our jobs. We value our customers, and offer them the best solutions in engineers construction. We stand behind the work we do, And we are committed to the clients we serve"
---------- all the staff of Minle Machine Manufacture.
Trailer Concrete pump, as well known as concrete pump, it was composed of pump body and delivery pipe. It was a kind of machine that use pressure to continuously transport concrete along the pipeline, which was mainly used in the construction of houses, Bridges and tunnels. It was mainly divided into gate valve concrete pump and S valve concrete pump.
How to use the Trailer
Concrete Pump
- The Trailer Concrete Pump should be placed on a solid and flat ground, with the supporting legs down and the fuselage placed smoothly.
- Check before operation to ensure that the electrical equipment and instruments are normal, the switch buttons and handle of all parts are in the correct position, the fastening points of the mechanical part are firm and reliable, the tightness of the chain and belt meets the specified requirements, and the transmission part operates normally.
- The concrete conveying pipe joints shall be tightly sealed and the pipe clips shall be firmly connected. Vertical pipe should be no less than 10 meters in front of the horizontal pipe with a check valve, it was strictly prohibited to connect the vertical pipe directly to the concrete delivery pump outlet.
- When dredging the blocked pipe, people around should be evacuated. Before disassembling and cleaning the pipeline, backpumping method should be adopted to remove the pressure of the conveying pipeline. It is strictly forbidden to pipe mouth to person when disassembling.
- Please not remove the hopper grid and other safety devices during operation. Did not climb or ride the conveying pipe, not put your hand into the valve body to work, not remove the pipe when pumping.
- When cleaning the pipe, the operator should leave the pipe outlet and bend joint. When cleaning the pipe with compressed air, no one and equipment shall be allowed within 10 meters of the pipe outlet.
- After the operation, unload the hydraulic system and return all the control switches to the original position.
Main Parts concrete pump:
1. Lubrication System--Automatically;
2. Diesel engine--Cummins/Weichai/Yuchai;
3. Cooling System-- Water cooling or air cooling;
4. Pumping system --Alloy parts, large torque motor;
5. Electronic control system----Schneider, Mitsubishi, Siemens, OMRON;
6. Hydraulic system Concrete mixer with trailer pump-KAWASAKI, Rexroth;
Company information:
Taian Minle Machine Manufacture Co., Ltd. is the professional manufacture in China, Lic. No. 913709006140867770 We Specialize in the trailer
concrete pump, concrete mixer with pump, truck-mounted concrete pump.
Our Mission is to consistently provide exemplary service to each and every customer.
We work to develop long-term, mutually beneficial relationships with our private sellers, dealers and concrete pump buyers. Our success depends upon the success of our customers!
Why choose MINLE?
MINLE Concrete Pumps offers superior engineering with high quality craftsmanship and design in every concrete pump that is using all over in the world. All of our concrete pumps are designed and assembled with the owner and operator in mind. With no complicated computer systems, our concrete pumps offer operator friendly controls that are easy to understand and will help complete your job on time with reliability.
After sales Service:
1: Provide 24 hours online service;
2: Provide user training services, including operation and application case demonstration;
3: If you need, we will send our technique to your site to provide services for users;
4: We can provide users with remote online fault diagnosis, analysis and solution timely;
5: Provide user tracking service, and visit users irregularly;
6: Mobile: 008615066732025 and Tel (+86-0538-8531114) is available 24/7, 365 days a year.
---------------------------
Contact: Michael Cheng
Mobile: 008615066732025
Taian Minle Machine Manufacture Co., Ltd.