Basic Info.
Machining Process
Hydraulic
Structure
Welded and Hydraulic System
Vibrating Amplitude
2.2mm
Certification
ISO9001: 2000, CE
Air Consumption
16MPa/Min
Function
Spraying Concrete
Max. Aggregate Size for Pump
30mm
Transport Package
Nude Package
Specification
5000mmx1500mmx1700mm
Product Description
Engineering Construction Machinery Trailer Concrete Pump Max. concrete output for pump | 40m3/h |
Power | Diesel fuel engine |
Max. aggregate size for pump | 30mm |
Max. aggregate size for shotcrete | 15mm |
Engine power | 85kw |
Productivity for shotcrete | 7m3/h |
Concrete spray distance | 100m |
Air compressor | Optional |
Max. shotcrete distance | 50m |
working air pressure | 0.4-0.6Mpa |
Air compressor | Optional |
Weight | 3500kg |
Overal size | 5300mmx1500mmx1700mm |
Concrete convey horizontal distance | 500m |
Concrete convey vertical height | 150m |
Diesel engine | CHANGCHAI |
Hopper capacity | 0.3m3 |
Concrete slump | 12-18cm |
Feeding height | 1100mm |
Oil capacity | 100L |
resilience ratio | 10% |
High working efficiency: hydraulic pumping type, high system reliability, stable conveying capacity.Can be used for grouting, filling, grouting, pumping and other construction. Continuously adjustable injection amount: variable plunger pump is adopted for the main oil pump, and the injection speed can be freely adjusted (the maximum number of switching adjustment amount shall not be more than 16 times /min). The additive amount of accelerating agent is continuously adjustable: it can be continuously adjusted according to the amount of shotcrete. Long service life of wearing parts: the service life of wearing parts of the main engine is not less than 4000m3 of injection.
Trailer Concrete Pump, as well known as concrete pump, it was composed of pump body and delivery pipe. It was a kind of machine that use pressure to continuously transport concrete along the pipeline, which was mainly used in the construction of houses, Bridges and tunnels. It was mainly divided into gate valve concrete pump and S valve concrete pump.
Large Trailer Concrete Pump, used for tall buildings, high-speed, flyover and other large concrete engineering concrete conveying work.It is composed of pump body and conveying pipe.
How to use the Trailer Concrete Pump
- the Trailer Concrete Pump should be placed on a solid and flat ground, with the supporting legs down and the fuselage placed smoothly.
- check before operation to ensure that the electrical equipment and instruments are normal, the switch buttons and handle of all parts are in the correct position, the fastening points of the mechanical part are firm and reliable, the tightness of the chain and belt meets the specified requirements, and the transmission part operates normally.
- the concrete conveying pipe joints shall be tightly sealed and the pipe clips shall be firmly connected.Vertical pipe should be no less than 10 meters in front of the horizontal pipe with a check valve, it was strictly prohibited to connect the vertical pipe directly to the concrete delivery pump outlet.
- when dredging the blocked pipe, people around should be evacuated.Before disassembling and cleaning the pipeline, backpumping method should be adopted to remove the pressure of the conveying pipeline.It is strictly forbidden to pipe mouth to person when disassembling.
- Please not remove the hopper grid and other safety devices during operation. Did not climb or ride the conveying pipe, not put your hand into the valve body to work, not remove the pipe when pumping.
- when cleaning the pipe, the operator should leave the pipe outlet and bend joint.When cleaning the pipe with compressed air, no one and equipment shall be allowed within 10 meters of the pipe outlet.
7) after the operation, unload the hydraulic system and return all the control switches to the original position.
Piping design Portable Concrete Trailer Pump
The concrete delivery pipe shall be arranged according to the characteristics of the project and construction site and the concrete pouring scheme. You should shorten the length of the pipeline, less elbow and hose. The laying of delivery pipe should ensure safe construction, facilitate cleaning pipe, troubleshooting and installation and disassembly maintenance.
Concrete delivery pipes of the same diameter shall be used in the same pipeline. When the new and 1-day sections are adopted at the same time, the new pipe should be arranged at a place with higher pumping pressure. The pipeline should be arranged horizontally, horizontally and vertically. A schematic drawing of pipe layout shall be drawn, the specifications and quantities of various pipe fittings, pipe connecting rings and elbow pipes shall be listed, and a list of spare parts shall be proposed. The concrete delivery pipe should be selected according to the maximum particle size of coarse aggregate, the type of concrete pump, the delivery distance of concrete output, and the degree of conveying difficulty. The delivery pipe shall have a strength suitable for pumping conditions.The pipe section without crack, bump and bend should be used. Pipe joints shall be tight, strong enough to be quickly assembled and dismantled. When the minimum pipe diameter of conveying pipe is lOOmm, the maximum particle size of coarse aggregate cannot exceed 30mm, and when the minimum pipe diameter is 125mm, the maximum particle size cannot exceed 40mm. When piping vertically upward, the length of horizontal pipe on the ground shall not be less than 1/4 of the length of vertical pipe, and shall not be less than 15m, or comply with the provisions of the product specification.A globe valve shall be set at the root of the conveying pipe at the y-shaped pipe outlet 3 ~ 6m of the concrete pump to prevent the backflow of concrete mixture.When pumping underground structures, the horizontal pipe axis on the ground should be perpendicular to the y-shaped pipe outlet axis.When inclined downward piping, exhaust valve should be set at the upper end of inclined piping;When the height difference is greater than 20m, a horizontal pipe with 5 times the height difference length should be set at the lower end of the inclined pipe.If the condition is limited, the elbow pipe or ring pipe can be added to meet the requirement of 5 times the height difference length.The fixation of concrete conveying pipe shall not be directly supported on steel bars, formwork and embedded parts. Horizontal pipe shall be fixed with bracket, platform pad and sling at a certain distance, so as to eliminate pipe blockage, install, dismantle and clean the pipe.The vertical pipe should be fixed in the hole on the wall and the column or the roof of the floor with embedded parts.In the wall and column, each section of the pipe should not be less than 1 fixed point, in each floor slab holes should be fixed. A bend at the lower end of a vertical pipe should not be used as a support point for an upper pipe.Suitable for steel support to bear the weight of vertical pipe.When the vertical pipe is fixed on the scaffold, the scaffold can be strengthened as required.There shall be no leakage of slurry at the clamp of pipe joint.In hot season construction, it is advisable to cover the concrete conveying pipe with wet cloth and warm straw bag to avoid sunshine.Construction in cold season, it is advisable to use insulation materials to cover the kungfu soil conveying pipe, to prevent the concrete inside the pipe from freezing, and to ensure the temperature of concrete into the mold.When the horizontal conveying distance is more than 200m, the vertical conveying distance is more than 40m, the conveying pipe is vertically downward or the horizontal pipe is arranged in front of the inclined pipe,} when the cement consumption per unit of kungfei soil mixture is less than 300kg/m3, the piping method and pumping process must be reasonably selected, it is advisable to use large diameter concrete conveying pipe and long conical pipe, and less elbow pipe and hose.When the conveying height exceeds the maximum conveying distance of concrete pump, relay pump (successor pump) can be used for pumping.In addition, according to the characteristics of engineering structure, construction technology, cloth requirements and piping conditions, the choice of cloth equipment.The distribution equipment shall be arranged according to the size of the structure plane, the piping condition and the length of the cloth rod, and it shall cover the entire structure plane, and the cloth shall be distributed evenly and quickly. The distributing equipment should be firmly and stably installed.
1.Power system Trailer Concrete Pump
Hydraulic oil pump: Germany Rexroth or Japan Kawasaki are adjusted. Diesel power: Germany Deutz, Weichai, Schneider, Japan Siemens, Mitsubishi are adjusted. The main power could be adjusted by the user
2.Electronic control system Trailer Concrete Pump
Japan Mitsubishi Programmable Logic Controller (PLC) electronic control system. Main electric elements are imported original Schneider, Siemens, OMRON, LG etc. The control mode: manual operation and wireless remote control Humanity and intelligent electronic control system optimizes the person-machine interface.8-digital pumping time accumulation timer provides exact data for the user, Automatic anti-pump function and optimized program design. Automatic trouble monitoring function.
3.Hydraulic system Trailer Concrete Pump
The unique open hydraulic system and hydraulic cushion technology contribute to the smaller exchange impact and less heat of the system. Meanwhile, with the famous brand of main pump and hydraulic valve, the safety and reliability of the concrete pump are guaranteed. The hydraulic pipeline selects the high performance seamless steel pipes and all pipe joints and high pressure hoses are of the famous brands. A number of high pressure accumulators and their excellent cushion performance reduce the requirement of S pipe vale for the concrete. The concrete is delivered freely.
4.Pumping system Trailer Concrete Pump
Pumping displacement variable adjustment: Change the pumping displacement according to the construction to meet the requirement of the condition. Reducing design of the hopper could release the reducing pressure of the concrete into the delivery pipe maximally, and prolong the service life of the S pipe outlet.
5.Lubrication System Trailer Concrete Pump
The patented central automatic lubrication system comes with a piston grease-pump, features high pressure and reliability, which can realize automatic lubrication of piston. The filters at the outlet and the inlet of oil ports as double protections guarantee the system reliability.
6.Cooling System Trailer Concrete Pump
Compulsory air cooled heat exchanger keeps the temperature of the hydraulic oil below 60 degree,that ensures the whole hydraulic system works at normal status.
Company information:
Taian Minle Machine Manufacture Co., Ltd. is the professional manufacture in China, Lic. No. 913709006140867770 We Specialize in theelectric concrete stationary pump, concrete mixer with pump, truck-mounted concrete pump. Our Mission is to consistently provide exemplary service to each and every customer.
We work to develop long-term, mutually beneficial relationships with our private sellers, dealers and concrete pump buyers. Our success depends upon the success of our customers!
Why choose MINLE?
MINLE Concrete Pumps offers superior engineering with high quality craftsmanship and design in every concrete pump that is using all over in the world. All of our concrete pumps are designed and assembled with the owner and operator in mind. With no complicated computer systems, our concrete pumps offer operator friendly controls that are easy to understand and will help complete your job on time with reliability.
When you buy a MINLE shotcrete sprayer, you get over 20 years of end user knowledge with our industry leading support/service network. We provide world class products and services, setting the standards for quality through continuous and significant investment in research and development. We provide our clients with advice and support ranging from the right choice of machines to be used for a construction project to engineering solutions. Our machines are used for a range of applications including civil engineering, mining, tunnelling, pre-cast factories, large scale industrial projects and power stations. We handle all types of projects, irrespective of scale or remoteness of location.
We combine top end German engineering, technology, expertise and high manufacturing standards with locally relevant requirements to provide a comprehensive solutions package. In 1999 we were one of the first construction machinery, Manufacturers to receive ISO 9001 certification followed by 9001/2000 certification in 2005.
"It is our goal to ensure that the work we do at our foreign trade business is superior and that safety is a priority on all our jobs. We value our customers, and do our best to meet all their needs. We stand behind the work we do, And we are committed to the clients we serve" ------Michael Cheng
------------------------
Michael Cheng
Mobile : 008615066732025
Taian Minle Machine Manufacture Co., Ltd.
Address:
No. 28 Taixing Street Manzhuang Town, Tai′an, Shandong, China
Business Type:
Trading Company
Business Range:
Auto, Motorcycle Parts & Accessories, Construction & Decoration, Manufacturing & Processing Machinery, Tools & Hardware
Management System Certification:
ISO 9001, ISO 14001, ISO 20000, BSCI, PAS 28000
Company Introduction:
Taian Minle Machine Manufacture Co., Ltd. is the professional manufacture in China, Lic. No. 913709006140867770 We Specialize in the concrete pump, concrete mixer with pump, truck-mounted concrete pump
Our Mission is to consistently provide exemplary service to each and every customer.
We work to develop long-term, mutually beneficial relationships with our private sellers, dealers and concrete pump buyers. Our success depends upon the success of our customers!
Why choose MINLE?
MINLE Concrete Pumps offers superior engineering with high quality craftsmanship and design in every concrete pump that is using all over in the world. All of our concrete pumps are designed and assembled with the owner and operator in mind. With no complicated computer systems, our concrete pumps offer operator friendly controls that are easy to understand and will help complete your job on time with reliability.
When you buy a MINLE Concrete Pump, you get over 20 years of end user knowledge with our industry leading support/service network. We provide world class products and services, setting the standards for quality through continuous and significant investment in research and development. We provide our clients with advice and support ranging from the right choice of machines to be used for a construction project to engineering solutions. Our machines are used for a range of applications including civil engineering, mining, tunnelling, pre-cast factories, large scale industrial projects and power stations.
We handle all types of projects, irrespective of scale or remoteness of location.
We combine top end German engineering, technology, expertise and high manufacturing standards with locally relevant requirements to provide a comprehensive solutions package. In 1999 we were one of the first construction machinery
Manufacturers to receive ISO 9001 certification followed by 9001/2000 certification in 2005.
"It is our goal to ensure that the work we do at our foreign trade business is superior and that safety is a priority on all our jobs. We value our customers, and do our best to meet all their needs. We stand behind the work we do, And we are committed to the clients we serve" ------Michael Cheng